摘è¦ï¼šå»£å·žç™¼(fÄ)é›»å» æœ‰é™å…¬å¸è¥¿æ‘ç†±é›»å» 1號é‹çˆçµ¦ç²‰æ©Ÿ(jÄ«)ç”±YCT一160—4A滑差電動機(jÄ«)改為TYPEY100一L1—4電動機(jÄ«)åŠACS 140(0.12~2.2 kwï¼‰è®Šé »å™¨æŽ§åˆ¶åŽï¼Œåœ¨ä¸€æ¬¡35 kV 系統(tÇ’ng)外線路用戶å´(cè)çŸè·¯æ•…éšœä¸ã€‚雖然繼電ä¿è·(hù)動作æ£ç¢ºï¼Œä½†ä»å¼•èµ·1號é‹çˆæ»…ç«ã€‚通éŽå°äº‹ä»¶åŽŸå› é€²(jìn)行分æžï¼Œå¾—出åˆç†çš„æ”¹é€²(jìn)方法,從而å°åŒé¡žè¨(shè)備的è¨(shè)計與改進(jìn)æå‡ºç›¸é—œ(guÄn)åƒè€ƒã€‚
é—œ(guÄn)éµè©žï¼šé‹çˆï¼› 給粉機(jÄ«)ï¼› è®Šé »å™¨ï¼› 飛輪; 機(jÄ«)械慣é‡
[b][align=center]Analysis of boiler flameout caused by an external line fault
ZENG Ling-jun,SHI Feng
(Ouangzhou Power Plant Co.,Ltd,,Guangzhou 51ï½›ï½160,China)[/align][/b]
Abstract:The pulverized fuel feeder was changed from YCT-160—4A motor to TYPEY100一L1—4 motor and ACS 140(0.12~2.2 kW )transducer for Unit 1 boiler in Xicun Cogeneration Power Plant under Ouangzhou Power Plant Co,, Ltd.In an accident caused by the outside 35 kV feeder line short—circuit damage, though the relay—set acted correctly,the pulverized fuel feeder still caused flameout in the bo iler.This paper analyzes the accident and brings forward rational improving measures.which can be referenced in the design and improvement of similar equipment.
Key wolds:bo iler; pulverized coal feeder;transducer; flywheel;mechanicalinertia
廣州發(fÄ)é›»å» æœ‰é™å…¬å¸è¥¿æ‘ç†±é›»å» 1號é‹çˆåž‹è™Ÿç‚ºWGZ220ã€9.8.13,于1989å¹´5月投產(chÇŽn)至2003年底æ¢ï¼Œçµ¦ç²‰æ©Ÿ(jÄ«)以å‰é‡‡ç”¨YCT160.4A滑差電動機(jÄ«)進(jìn)行調(dià o)速給粉,其間多次é‡åˆ°35 kV系統(tÇ’ng)ç·šè·¯çŸè·¯æ•…障,從未引起1號é‹çˆæ»…ç«ã€‚2003年底,1號é‹çˆçµ¦ç²‰ç³»çµ±(tÇ’ng)æ”¹ç”¨è®Šé »å™¨èª¿(dià o)速åŠTYPEY100.L1—4電動機(jÄ«)åŽï¼Œæœªå¾ˆå¥½è€ƒæ…®æ©Ÿ(jÄ«)械慣é‡çš„ä½œç”¨ã€‚æ”¹é€ åŽæ©Ÿ(jÄ«)械慣é‡éŽå°ï¼Œç•¶(dÄng)35 kV系統(tÇ’ng)外線路çŸè·¯æ•…障引起ACS140(0.12~2.2 kWï¼‰è®Šé »å™¨æ¬ å£“æˆ–çž¬æ™‚å¤±é›»åœæ¢è¼¸å‡ºæ™‚(通éŽé›»è©¦ç模擬上述ç¾(xià n)象試驗(yà n)給粉機(jÄ«)è®Šé »æŽ§åˆ¶é‡èµ·å‹•æ£å¸¸ï¼‰ï¼Œç™¼(fÄ)ç¾(xià n)1號é‹çˆçµ¦ç²‰æ©Ÿ(jÄ«)轉(zhuÇŽn)速波動較大,影響給粉é‡ï¼Œåš´(yán)é‡å¨è„…1號é‹çˆçš„安全é‹(yùn)行。2005å¹´4月30日,西æ‘ç†±é›»å» ç™¼(fÄ)生一起由35kV系統(tÇ’ng)外線路用戶å´(cè)çŸè·¯æ•…障,導(dÇŽo)致西æ‘ç†±é›»å» 1號é‹çˆæ»…ç«çš„æ•…障,ç¾(xià n)å°‡æ¤æ¬¡é‹çˆæ»…ç«åŽŸå› åˆ†æžæ‰€å¾—到的經(jÄ«ng)é©—(yà n)教訓(xùn)作一總çµ(jié),以供åƒè€ƒã€‚